Currently in a career transition and am actively seeking a management role where my skills and expertise will further both the company and my career.
Highly motivated and detailed project manager with over 15 years in the construction industry, oversaw construction projects from conceptual designs through contract negotiations to construction. Strong design/build background in creating new and innovative ideas resulting in more energy efficient and cost effective designs.
Miller Valentine Commercial Construction, Cincinnati OH 2007 - 2008
Project Manager
Managed a project team and oversaw multi-million dollar construction projects. Coordinated with the sales and development teams and developed a successful sales strategy to win projects.
• Coordinated the overall design process between the Client/Owner, design team and contractor. This coordination ensured the Client/Owner’s needs were being met, construction costs were more tightly controlled, and an efficient project schedule was created.
• Analyzed the project’s specific requirements and from there, assembled the appropriate design team (Civil, A/E, and MEP), created detailed scope of works, issued subcontractor and supplier bid packages, and prepare a compressive estimate.
• Implemented Value Engineering ideas that resulted in savings to the Client/Owner up to 20%.
• Executed Client/Owner contracts (GMP, Lump Sum, Cost–Plus), this included negotiating contract terms and conditions, agreeing to contractor fees, insurance requirements, project schedule, payment terms, and scope change procedures.
• Designed plans, prepared budgets, wrote proposals and specifications for 10-50 acre site developments, industrial and manufacturing warehouses, multi-story buildings, building additions, and retail and office tenant renovations.
• Responsible for overall project costs by analyzing monthly job cost projection reports, preparing monthly billing statements, reviewing and approving vendor and subcontractor’s invoices.
• Reviewed construction documents, specifications and drawings and for coordination and accuracy.
Kiesland Ltd., Cincinnati, OH 2002 - 2007
Project Manager
Worked directly with Client/Owners to understand their business and operations to cost effectively design and engineer facilities that met their requirements.
• Reviewed manufacturing processes with the operations managers and collectively developed and designed equipment floor plans and layouts, selected and sized HVAC equipment systems, and implemented electrical systems to service the building’s manufacturing current and future requirements.
• Value engineered and designed a 13,000 SF building’s foundation system, structural slab-on-grade and steel structure to support over 750 tons of roof top equipment.
• Redesigned and re-engineered the structural, mechanical and electrical systems for a church’s multi-purpose and classroom addition that met the congregation’s budget.
• Coordinated and managed projects that integrated structural steel design with structural precast concrete panels and pre-engineered metal building components.
• Recommended and provided costs alternatives to Client/Owners for different building materials types, product options, and interior finish colors and samples.
Vector Construction Company, Erlanger KY 2000 - 2002
Project Engineer/Quality Control
Monitored the quality control and quality assurance of construction activities to verify they were in accordance with the construction documents and specifications.
• Responsible for the field engineering, layout, quality control and construction scheduling of a six level post-tension concrete parking garage with five stories of offices above.
• Conducted weekly scheduling and progress meetings with the subcontractors which resulted in the project being completed on time.
• Tracked and reviewed shop drawings and submittals to be sure they were in compliance with the GSA’s requirements, plans and specifications.
• Recorded and coded man hours, material quantities, equipment usage, etc.
Corporex Constructors, Covington, KY 1998 - 2000
Assistant Site Manager
Provided on site supervision for subcontractors and documented construction activities.
• Verified and inspected the subcontractor’s layout and installation was per the design drawings and the approved materials, products, equipment were being installed.
• Responsible for writing daily job reports which included the work each subcontractor completed and their crew size, material deliveries, building inspections, weather delays and forecasts.
• Performed site safety audits, recorded the safety hazard and notified the responsible contractor to correct the hazard.
• Oversaw execution and completion of punchlists.
Matrix Building Company, Covington, KY 1994 -1997
Assistant Project Manager
Assembled documentation associated with the bidding, executing, and closing phases of projects.
• Performed material quantity take-offs, assembled bid packages, analyzed subcontractor’s bids.
• Inputted construction schedules into Surtrak.
• Performed shop drawings and submittal reviews.
• Compiled information for Operation and Maintenance manuals.
EDUCATION
University of Cincinnati, Cincinnati, OH
B.S., Civil and Environmental Engineering
Concentration: Construction Project Management
PROFESSIONAL TRAINING
LEED AP Seminar, Dayton OH, 2008
Certified Commercial Investment Member (CCIM)
• CCIM 101, Indianapolis, IN, 2007
• CCIM 103, Raleigh N.C., 2008
MMS Management courses, Cincinnati, 2008
CERTIFICATIONS
OSHA 10-hour Construction Safety Class
COMPUTER SKILLS
Suretrak, Advantage, Microsoft Office
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.